The three-layer PE process uses epoxy powder coating as the bottom layer and is bonded with polyethylene (PE) and adhesive to provide robust anti-corrosion protection for steel pipes. This method is widely adopted domestically and internationally for oil and gas pipelines, as well as civil gas and water supply systems.
Upload Pipes
→ Screw Conveyor for Pipes
→ Rust Removal (Intermediate Frequency Heating)
→ Epoxy Powder Coating Application
→ Outer Layer Coating (Solid/Liquid & Polyethylene Coating)
→ Cooling Spray
→ Screw Conveyor for Pipes
→ Grinding Pipes
→ Unload Pipes
| No. | Description | Qty. |
|---|---|---|
| 1 | Transmission line | 1 set |
| 2 | Shot blasting derusting line | 1 set |
| 3 | Cyclone dust collector | 1 set |
| 4 | Pulse filter cartridge dust collector | 1 set |
| 5 | Centrifugal wind blower | 1 set |
| 6 | Derusting equipment electrical control system | 1 set |
| No. | Description | Qty. |
|---|---|---|
| 1 | Coating transmit system | 1 set |
| 2 | Intermediate frequency heating system | 1 set |
| 3 | Epoxy spraying system | 1 set |
| 4 | Automatic feeding dryer | 2 sets |
| 5 | SJ-65/30 single screw high efficiency extruder | 1 set |
| 6 | SJ-120/30 extruder | 1 set |
| 7 | Hot melt adhesive extrusion die head | 1 set |
| 8 | PE sheet extrusion die head | 1 set |
| 9 | Hot melt adhesive / PE sheet press device | 1 set |
| 10 | Stainless steel spray powder chamber | 1 set |
| 11 | Cooling water spray system | 1 set |
Platform System
| No. | Description | Qty. |
|---|---|---|
| 1 | Steel pipe up load platform | 1 set |
| 2 | Derusting transition platform | 1 set |
| 3 | Finished pipe storage system | 1 set |
| 4 | Hydraulic system | 3 sets |
Grooving System
| No. | Description | Qty. |
|---|---|---|
| 1 | PE grooving device | 2 sets |
| 2 | Hydraulic elevating pipe turner | 2 sets |
| 3 | Operating cabinet | 1 set |
Q1. What is the size of pipe diameter your equipment can produce?
A: We can produce four main models:
Q2. What is the descaling grade?
A: SA2.5
Q3. What is your anti-corrosion coating standard?
A: Our equipment meets: SY/T0413-2002, GB/T23257-2009, DIN 30670, DIN 30678, and relevant coating specifications from the American Corrosion Association and DNV; fully compliant with SY/T0315-2005 and CNPC38-2002.
Q4. What is the delivery time?
A: 2–3 months after deposit.
Q5. What is the production output?
A: Output varies by pipe diameter, with maximum 3 to 8 km/day and annual processing capacity up to 2 million square meters (Φ508 mm).
Q6. What is the coating thickness?
A: 80–800 µm
Q7. In which countries have you sold your 3PE equipment?
A: We have produced nearly 50 sets of 3PE processing lines for countries including Russia, Iran, UAE, India, Belarus, Kazakhstan, and others.
Q8. What is your after-sales service?
A:
Qingdao Huashida is one of the largest professional manufacturers and exporters of anti-corrosion and insulation equipment in China. With over 20 years of experience and strong R&D capabilities, we provide both standardized and customized solutions for global clients.
Main products include:
![]()
![]()
![]()