logo

Automatic PU Spraying PE Winding Thermal Pre-Insulated Pipe Production Line

1
MOQ
US$1,000,000.00-1,300,000.00
Prix
Automatic PU Spraying PE Winding Thermal Pre-Insulated Pipe Production Line
traits Galerie Description de produit Demandez une citation
traits
Caractéristiques
Capacité: 3 à 4 unités/h
Épaisseur de mousse: 30-100mm
Niveau de nettoyage: SA2.5
Mettre en évidence:

Polyurethane Spraying Foam Preinsulated Steel Pipe Machine

,

Polyurethane Insulation Pipe Machine

,

Polyurethane Foam Pre-Insulated Pipe Production Line

Informations de base
Lieu d'origine: Qingdao, en Chine
Nom de marque: huashida
Certification: CE
Numéro de modèle: Pipe préisolée 508-1620
Conditions de paiement et expédition
Détails d'emballage: Paquet standard
Délai de livraison: 60 jours
Conditions de paiement: L/C, T/T, Western Union, MoneyGram
Capacité d'approvisionnement: 30 unités/année
Description de produit
PU Spraying PE Winding Pre-Insulation Pipe Production line for Oil Pipeline

 

Product Description


Huashida Rigid polyurethane spraying polyethylene winding prefabricated directly buried insulation pipe consists of steel working pipe, spraying polyurethane rigid foam insulation layer and winding polyethylene outer protective pipe.
Automatic PU Spraying PE Winding Thermal Pre-Insulated Pipe Production Line 0

The line adopts continuous spraying production process.It features a high degree of automation, fast production efficiency, raw material saving, increased foaming and closed-cell rate, reduced water absorption rate, and three-in-one molding, making its performance more reliable. Low-carbon and environmentally friendly products have high economic and social benefits.

The production line is composed of three major parts:

Steel Pipe Shot Blasting Machine
Polyurethane Spraying Production Line

√ PE Outer Jacket Winding Production Line

Application scenario:

Mainly used for the production of thermal insulation pipes for heating, cooling, petroleum, chemical and other fields.

Product Parameters

Production steps:

1. Remove rust from steel pipe surface
2. preheat the steel pipe to get it ready for polyurethane spraying
3. Spray polyurethane evenly on steel pipe outer surface
4. Wrap melted HDPE strap around the PU foam
5. Trim the pipe ends

Production line parameter:

1.Steel pipe range: 206mm-1820mm

2.Processing capacity:≤250m2/h

3. Cleaning class: Sa2.5

4.Used material: ISO (isocyanate), POLY (premixed polyether polyols), PE

5.Main equipment: Shot blasting and rust removal production line, Polyurethane spray production line, PE winding production line.

Automatic PU Spraying PE Winding Thermal Pre-Insulated Pipe Production Line 1
Automatic PU Spraying PE Winding Thermal Pre-Insulated Pipe Production Line 2

 

Technical Parameters

 

Steel Pipe Diameter (mm) Insulation Thickness (mm) Outer Jacket Diameter (mm) Minimum Outer Jacket Wall Thickness (mm)
500 30-60 580-640 5.6
630 30-60 710-772 6.6
710 30-60 790-850 7.2
800 30-60 885-950 7.9
900 30-60 980-1054 8.7
1000 30-60 1090-1155 9.4
1100 30-60 1190-1250 10.2
1200 40-100 1316-1436 11
1400 50-100 1538-1638 12.5
1500 50-100 1638-1738 12.5


International Trading show

Automatic PU Spraying PE Winding Thermal Pre-Insulated Pipe Production Line 3



produits recommandés
Prenez contact avec nous
Personne à contacter : Mr. Lily
Téléphone : 15764286995
Télécopieur : 86-532-80999083
Caractères restants(20/3000)